Valid Test Simulate materials for certificate qualification
 
[Apr 14, 2022] DES-1111 Exam Dumps PDF Updated Dump from  TestSimulate Guaranteed Success [Q16-Q31]

[Apr 14, 2022] DES-1111 Exam Dumps PDF Updated Dump from TestSimulate Guaranteed Success [Q16-Q31]

Rate this post

[Apr 14, 2022] DES-1111 Exam Dumps PDF Updated Dump from TestSimulate Guaranteed Success

Pass Your EMC Exam with DES-1111 Exam Dumps

NO.16 What is a Composite Group in BCSD?

 
 
 
 

NO.17 A customer is planning an SRDF/S implementation. They are concerned about the performance of their application when the initial synchronization of the data occurs.
Which SRDF mode should be used during the initial synchronization period?

 
 
 
 

NO.18 The Reserved Capacity for a Storage Resource Pool (SRP) on a VMAX All Flash array is set to 15%. A TimeFinder SnapVX snapshot is created for a Storage Group containing 10 devices. An application is actively performing read and write I/O to these devices. Allocation for the SRP reaches 85%.
What happens to the snapshot?

 
 
 
 

NO.19 Refer to the exhibit.

An SRDF/A solution with BCSD is designed and the results are shown in the exhibit. A customer requirement was a five-minute RPO. In the exhibit shown, the RPO is above the customer requirement.
How can the five-minute RPO requirement be met?

 
 
 
 

NO.20 How many hosts are supported by PowerPath and PowerPath/VE in the FX software package?

 
 
 
 

NO.21 SRDF/A has been enabled between two PowerMax arrays. An extended loss of all RDF links occurs.
What is the state of the RDF pair after link connectivity is restored?

 
 
 
 

NO.22 A storage architect is evaluating the performance of a PowerMax array during business hours. They want to know how much extra load the PowerMax can handle without significant performance degradation. The Workload Planner is used to identify the hot spots during the recurring backup windows.
Between 9:30 PM and 1:30 AM and between 3:15 AM and 5:30 AM, backups are causing the PowerMax to exceed the best practice recommendation. The Recurring System Data Exclusion Periods chart is used to filter out these hot spots. After running this workload planning for a few weeks, they notice that the selection of records they previously made are showing different numbers than when they started viewing the report, several weeks ago.
What is the explanation for this behavior?

 
 
 
 

NO.23 Which director emulating performs internal array operations and provides data services?

 
 
 
 

NO.24 A PowerMax Storage Group has Host I/O limits set at 10000 IOPS. The Port Group contains four ports across different directors. The Dynamic Distribution is set to OnFailure.
What is the maximum IOPS the Storage Group can achieve in the event a switch port being used by one of the director ports fails but the director remains online?

 
 
 
 

NO.25 What is the maximum number of front-end ports that can be configured on a PowerMax 8000?

 
 
 
 

NO.26 A storage architect is planning a Unisphere upgrade. Which password is required for the upgrade?

 
 
 
 

NO.27 A storage administrator is provisioning storage on a PowerMax 2000 array. The application requires fast reads and the highest possible data protection.
Which RAID level should be recommended?

 
 
 
 

NO.28 What is the maximum number of BTP files that can be included in a project in Sizer?

 
 
 
 

NO.29 A data migration is being planned from a Hitachi to a PowerMax using Open Replicator. Which flag is used to protect against SAN failure?

 
 
 
 

NO.30 What is the maximum number of Bricks and drives that can be configured in a VMAX 950?

 
 
 
 

NO.31 What method is used to collect host-based performance data for Windows hosts with BCSD?

 
 
 
 

New Real DES-1111 Exam Dumps Questions: https://www.testsimulate.com/DES-1111-study-materials.html

Related Links: www.impactio.com www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below