Valid Test Simulate materials for certificate qualification
 
Authentic CTAL-TAE Dumps – Free PDF Questions to Pass [Q16-Q32]

Authentic CTAL-TAE Dumps – Free PDF Questions to Pass [Q16-Q32]

4.5/5 - (2 votes)

Authentic CTAL-TAE Dumps – Free PDF Questions to Pass

Guaranteed Accomplishment with Newest Sep-2022 FREE CTAL-TAE

ISQI CTAL-TAE Exam Syllabus Topics:

Topic Details
Topic 1
  • Set up and tear down the SUT for test execution
  • Design the appropriateTAAfor a given project
Topic 2
  • Understand “design for testability” and “design for test automation” methodsapplicable to the SUT
  • Analyze a system under test to determine theappropriateautomation solution
Topic 3
  • Explain the factors to be considered when identifyingreusability of components
  • Interpret both test data and test cases and transform them into executable scripts
Topic 4
  • Analyze the SUT responses during test executionto steer subsequent test runs
  • Understanddesign considerations for a TAA
Topic 5
  • Specify test sequences or fully-fledged test behaviors
  • Analyze factors of implementation, use, and maintenancerequirementsfor a given TAS
Topic 6
  • Ability to trace the generated tests back to the model
  • Explaintherole that layers play within a TAA

 

Q16. Youare using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Whichof the following layers of the gTAA should you focus on for the TAS?

 
 
 
 

Q17. Which of the following statement about the implementation of automated regression testing is FALSE?

 
 
 
 

Q18. You have been asked to determine a TAS for a new release of a SUT,test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?

 
 
 
 

Q19. You are working on a TAS for standalone application. The automated tests are developed based on a automation framework that allows interaction with GUI elements using on object orientated API. The GUI elements include menus, buttons, radio buttons, text toolbars and their properties.
Whilst automating a test, you have discovered that the GUI elements of some third party components are not identifiable by the automated tool you are using.
Which of the following is the FIRST stepthat you take to investigate this issue?

 
 
 
 

Q20. You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automationregimefor the tests is not yet mature.
Which of the following statements is TRUE?

 
 
 
 

Q21. Which of the following statements about the reuse of TAS artefacts is TRUE?

 
 
 
 

Q22. A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.
Which statement BEST describes a reason why this defect could re-occur in future releases?

 
 
 
 

Q23. Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields (e.g text boxes).
What is the BEST recommendation for improving the TAS?

 
 
 
 

Q24. Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUTenvironment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.
Which of the following is NOT a relevant check for achieving your goal in this scenario?

 
 
 
 

Q25. Consider a TAS deployed into production. The SUT is a web application and the test suite consists of a set of automated regression tests developed via GUI. A keyword-driven framework has been adopted for automating the regression tests. The tests are based on identification at low-levels of the web page components (e.g class indexes, tab sequence indexes and coordinates) in the next planned release the SUT will be subject to significant corrective maintenance (bug-fixes) and evolution (new features) Maintenance costs to update the test scripts should be as low as possible and the scripts must be highly reusable.
Which of the following statements is most likely to be TRUE?

 
 
 
 

Q26. As a TAE you are evaluating a functional test automation tool that will be for several projects within yourorganization. The projects require that tool to work effectively and efficiently with SUT’s in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
* Is the test automation tool able to launch processors and execute test cases on multiple machines in
* different environments?
* Does the test automation tool support a licensing scheme that allows accessing different sets?
* Does the testautomation tool have a large feature set, but only part of the features will be sets?
* Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?

 
 
 
 

Q27. As a TAE you are evaluating a functional test automation tool that will be for several projects within your organization. The projects require that tool to work effectively and efficiently with SUT’s in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
* Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
* Does the test automation tool support a licensing scheme thatallows accessing different sets?
* Does the test automation tool have a large featureset, but only part of the features will be sets?
* Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?

 
 
 
 

Q28. Which of the following is NOT a technical design consideration for a TAA?

 
 
 
 

Q29. You have been asked to automate a set of functional tests at system Test level via the CLI of the SUT for the first release of a software system. The automated tests will be delivered to the learn in change of maintenance testing, who will use them for part of the regression testing. They have the following requirements.
1.The automated tests must be as fast and cheap to maintain as possible
2.The cost of adding new automated tests must be as low as possible
3.The automated tests must have a high level of independence from the tool itself Which of the following scripting techniques would be MOST suitable?

 
 
 
 

Q30. Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

 
 
 
 

Q31. A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment.
Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.
Which of the following would be the BEST way to automatically provides this report?

 
 
 
 

Q32. Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?

 
 
 
 

CTAL-TAE Braindumps PDF, ISQI CTAL-TAE Exam Cram: https://www.testsimulate.com/CTAL-TAE-study-materials.html

Related Links: www.stes.tyc.edu.tw fortunetelleroracle.com myportal.utt.edu.tt www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below