Valid Test Simulate materials for certificate qualification
 
[Q191-Q206] ISTQB Certified Tester Foundation Level Practice Tests 2023  Pass CTFL-Foundation with confidence!

[Q191-Q206] ISTQB Certified Tester Foundation Level Practice Tests 2023 Pass CTFL-Foundation with confidence!

4.6/5 - (8 votes)

ISTQB Certified Tester Foundation Level Practice Tests 2023 | Pass CTFL-Foundation with confidence!

Practice ISQI Certifications CTFL-Foundation exam. Online Exam Practice Tests with detailed explanations!

NO.191 An Incident Management tool implements the following defect state: Open, Assigned, Solved, Closed.
Consider the following defect report:
Id: T000561
Test Object: “Warehouse Management” application
Tester name: John Bishop
Date: 10th, April 2010
Test Case: MRT5561
Status: Serious
Priority:
Problem: After inputting the Total Quantity item = 450 in the SV034 screen, the system shows an unexpected error message = 47 Correction:
Developer name:
Closing date:
Which of the following is a valid criticism of this report?

 
 
 
 

NO.192 Which of the following is NOT a deciding factor in determining the extent of testing required?

 
 
 
 

NO.193 Before an invoice can be created, an account is required. Before an account can be set up, an account user is required (in order to set up the account). The software is delivered with a master user only, who can only create other types of users. The following test cases have been written to test the high-level structure of the software
a. Create an invoice
b. Amend an invoice
c. Process an invoice (send to customer)
d. Delete an invoice
e. Create an account
f. Create an account user
g. Amend an account user
h. Delete an account user
i. Amend an account
j. Delete an account
Which of the following test procedures would enable all tests to be run? [K3]

 
 
 
 

NO.194 Which of the following is a defect that is more likely to be found by a static analysis tool than by other testing techniques?

 
 
 
 

NO.195 Who closes normally the defect reports?

 
 
 
 

NO.196 What are the key features to be concentrated upon when doing a testing forworld wide web sites ..?

 
 
 
 

NO.197 Evaluate the status of the project against the defined exit criteria. Which of the following options shows the correct status? 2 credits

 
 
 
 

NO.198 How does software testing contribute to the quality of delivered software? [K2]

 
 
 
 

NO.199 Consider the following pseudo code:
1 Begin
2 Read Time
3 If Time < 12 Then
4 Print(Time, “am”)
5 Endif
6 If Time > 12 Then
7 Print(Time 12, “pm”)
8 Endif
9 If Time = 12 Then
1 0 Print (Time, “noon”)
1 1 Endif
1 2 End
How many test cases are needed to achieve 100 per cent decision coverage?

 
 
 
 

NO.200 Consider the following code:
int premium=2500;
if (age<30)
{
Premium = premium + 1500;
}
Which options suits for a correct combination of Boundary value and expected result. Assume first number as boundary followed by expected result.

 
 
 
 

NO.201 Your task is to compile a test execution schedule for the current release of software.
The system specification states the following logical dependencies:
An admin user must create/amend/delete a standard user.

A standard user is necessary to perform all other actions.

The test plan requires that re-tests must be performed first, followed by the highest priority tests. To save time, the test plan states that tests should be scheduled to create test data for the subsequent tests in the schedule.
The following test cases have been designed, with an indication of priority (1 being the highest priority) and whether the test has previously failed.

Which test execution schedule meets the test plan requirements and logical dependencies?

 
 
 
 

NO.202 Which of the following is a factor that could negatively influence the success of the deployment of a tool within an organization?

 
 
 
 

NO.203 Which of the following statements about Experience Based Techniques (EBT) is correct?

 
 
 
 

NO.204 A software application is supposed to calculate square root of all integers from 1 to 32767. The tester divides the input into valid and invalid equivalence classes. Valid equivalence class: 1-32767, invalid: all negative numbers, all numbers > 32767, all non-integers etc. However, when square root for all numbers in the valid equivalence class was calculated, it was found that for 3 number, the results were incorrect.
These number were not the boundary values. Which of the following is correct?

 
 
 
 

NO.205 Which TWO of the review types below are the BEST fitted (most adequate) options to choose for reviewing safety critical components in a software project? Select 2 options.

 
 
 
 
 

NO.206 As the last stage of a test cycle of an embedded device, you are performing exploratory testing. You observed that some characters (A, X and Z) sent via a serial port to the device do not get registered on the device whereas they should be. You suspect that this could be due to a wrong configuration of the “bit parity” parameter.
Which of the following items of an incident report would you be UNABLE to write down based on this information?

 
 
 
 

The best CTFL-Foundation exam study material and preparation tool is here: https://www.testsimulate.com/CTFL-Foundation-study-materials.html

Related Links: www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below