Valid Test Simulate materials for certificate qualification
 
Download Free Oracle 1z0-1003-22 Exam Questions & Answer [Q51-Q66]

Download Free Oracle 1z0-1003-22 Exam Questions & Answer [Q51-Q66]

Rate this post

Download Free Oracle 1z0-1003-22 Exam Questions & Answer 

Online VALID 1z0-1003-22 Exam Dumps File Instantly

Oracle 1z0-1003-22 Exam Syllabus Topics:

Topic Details
Topic 1
  • Describe the Custom Property Types
  • Explain the Calendar Capabilities in OFS
Topic 2
  • Explain Duration and Travel Statistics
  • Explain the Capabilities of OFS Forms
Topic 3
  • Describe Quota, Capacity and Booking Options
  • Describe Resource and Resource Type Settings
Topic 4
  • Explain the Usage of Filters within OFS
  • Inventory and Inventory Types
Topic 5
  • Explain the Capabilities of OFS Applications
  • Configure Resources and Resource Types
Topic 6
  • Describe Activities and Activity Type Features
  • Resources and Resource Types
Topic 7
  • Describe the Various Launch Conditions
  • Describe Activity Time Windows
  • Create an Activity Link Template
Topic 8
  • Describe Inventory Use and Inventory Types
  • Describe Users and User Type Settings

 

NO.51 What functionality does ‘Automatic Ordering’ enable when checked within the routing plan’s Assignment Parameters?

 
 
 
 

NO.52 Which two statement are correct regarding activity assignment via Collaboration?

 
 
 
 

NO.53 A customer has found that there are some instances where their technicians have recorded either exceptionally short (for example, “one-minute-wonders”) or long (for example, they forgot to set the status to “complete”) activity durations.
Given the importance of accurate data in a time-based self-learning system, which two constraints are in place and can be modified to ensure that outlier circumstances such as these do not affect future activity duration estimations?

 
 
 
 

NO.54 Your customer noticed a message that sometimes appears when they are moving activities between resources. The message reads “Soft skill mismatch” and the customer wants it changed to read “Resource does not meet Preferable work skill level”.
Which option fulfills that requirement?

 
 
 
 

NO.55 A customer wants to create a message scenario that, when launched, sends an email to the address of the immediate parent of the resource the activity is assigned to within the Oracle Field Service Cloud (OFSC) organizational hierarchy.
Which describes the correct message scenario configuration to support this requirement?

 
 
 
 

NO.56 On the Quota screen in Oracle Field Service Cloud (OFSC), there is a column that displays values for ‘Other Activities’.
Which describes the ‘Other Activities’ that contribute to the values displayed in that column?

 
 
 
 

NO.57 Your customer wants to configure an inner step message (“B”) to send an email if a previous messa (“A”) has Failed.
Which statement explains how this can be supported?

 
 
 
 

NO.58 What is the significance of the order of the activity filters within the Filters sections of the routing plan?

 
 
 
 

NO.59 A company very occasionally outsources some ad-hoc jobs to workers that are not employed directly by that company, and as such have created a new Resource Type in OFSC with the ‘Resource is a contingent worker1 feature enabled.
Which three of the following are correct regarding how those contingent workers will be handled by OFSC?

 
 
 
 
 

NO.60 A Company has a policy that “Gas Leak” and “Repair” Activity Types must be scheduled immediately to the nearest field resource.
In addition, the company needs to ensure that the system routes gas leaks with a higher priority than repairs.
What configuration must be used to support this requirement?

 
 
 
 

NO.61 A utility company sees several ‘New Connect’ activities being added to the routing bucket throughout the day.
They want ‘Meter Read’ activities to potentially be removed from the technician’s route so that the ‘New Connect’ activities can be assigned if the technician qualifies for the activity.
They enabled reoptimization in their routing plan and created a reoptimization filter targeting the ‘Meter Read’ activities.
What additional settings are required in the routing plan to meet the desired behavior?

 
 
 
 

NO.62 Which three configurations will enable booking to automatically close?

 
 
 
 
 

NO.63 Which two default attributes serve as stand-alone keys for work zones?

 
 
 
 
 
 

NO.64 A customer supports a particular type of activity that requires a security clearance to gain access to the job site, and they only have a few resources that have clearances.
These activities don’t happen all that often, and as such, they are not concerned with quota management for them. Instead, when an acti/ity of this type needs to be booked, the customer will directly assign it to one of their qualified resources.
Which API request will provide this customer with the information they need to directly assign the activity to the right resource?

 
 
 
 

NO.65 Which two statements are true regarding integrations between OFSC and DBaaS?

 
 
 
 

NO.66 Your customer requires the option for supervisors to “supervise” Junior engineers as they are performing certain activities.
For this functionality, you have created a new “Supervision” internal activity to manually link these activities so they start at the same time by different resources.
Which option is a valid way to configure this?

 
 
 
 

1z0-1003-22 Exam Dumps For Certification Exam Preparation: https://www.testsimulate.com/1z0-1003-22-study-materials.html

Related Links: www.stes.tyc.edu.tw www.dibiz.com myportal.utt.edu.tt www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below